Review Paper on Safety Induction, Quality Control, Productivity Calculation for Residential Building


Affiliations
1 Assistant Professor, Department of Civil Engineering, M.Kumarasamy College of Engineering, Karur, Tamil Nadu, India
2 Assistant Professor, Department of Civil Engineering, K.Ramakrishnan College of Technology, Tamil Nadu
     

   Subscribe/Renew Journal


The Aim of project is to find the Productivity for finishing works in the Construction Industry and suggest some ideas to overcome the delaying factors. In this project, we include safety induction, planning, and finishing activities work procedure, quality control, productivity and rate analysis. Every organization requires more productivity which increase their profit, quality and to reduce cost and time. Therefore, we have collected productivity data for certain finishing activities (Block Works, Cement Plastering,) from the industry for 30 working days. We could also able to learn the importance of Safety both inside and outside the site through the video screened and the Safety Practices by the Industry. From the Quality Control we have learnt the test to be carried out for different materials and works

Keywords

Finishing Activities, Productivity, Quality Control, Safety Measures
User
Subscription Login to verify subscription
Notifications
Font Size


  • Review Paper on Safety Induction, Quality Control, Productivity Calculation for Residential Building

Abstract Views: 324  |  PDF Views: 0

Authors

A. Rangaraj
Assistant Professor, Department of Civil Engineering, M.Kumarasamy College of Engineering, Karur, Tamil Nadu, India
P. Mukesh
Assistant Professor, Department of Civil Engineering, M.Kumarasamy College of Engineering, Karur, Tamil Nadu, India
S. Vigneshkannan
Assistant Professor, Department of Civil Engineering, K.Ramakrishnan College of Technology, Tamil Nadu

Abstract


The Aim of project is to find the Productivity for finishing works in the Construction Industry and suggest some ideas to overcome the delaying factors. In this project, we include safety induction, planning, and finishing activities work procedure, quality control, productivity and rate analysis. Every organization requires more productivity which increase their profit, quality and to reduce cost and time. Therefore, we have collected productivity data for certain finishing activities (Block Works, Cement Plastering,) from the industry for 30 working days. We could also able to learn the importance of Safety both inside and outside the site through the video screened and the Safety Practices by the Industry. From the Quality Control we have learnt the test to be carried out for different materials and works

Keywords


Finishing Activities, Productivity, Quality Control, Safety Measures