Steel Pile Driving in Marine Condition: Driving by Platform/Gantry in Endon Method. (date-24.02.06)


Affiliations
1 The Association of Engineers, India
     

   Subscribe/Renew Journal


The marine civil works are founded on steel tubular piles mainly vertical with 860mm dia and a wall thickness of 20mm. The marine steel piles are installed by driving the piles using diesel operated pile-driving hammer. Driving to be done upto the calculated SET to achieve the designed capacity. Designed capacity of each pile is 300t.
User
Subscription Login to verify subscription
Notifications
Font Size

Abstract Views: 318

PDF Views: 0




  • Steel Pile Driving in Marine Condition: Driving by Platform/Gantry in Endon Method. (date-24.02.06)

Abstract Views: 318  |  PDF Views: 0

Authors

Anup Kr. Bhattacharya
The Association of Engineers, India

Abstract


The marine civil works are founded on steel tubular piles mainly vertical with 860mm dia and a wall thickness of 20mm. The marine steel piles are installed by driving the piles using diesel operated pile-driving hammer. Driving to be done upto the calculated SET to achieve the designed capacity. Designed capacity of each pile is 300t.